My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1989-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:40:02 AM
Creation date
7/3/2020 10:39:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-1996
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1989-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\ S 0 ~ <br /> AMENDMENT TO THE APPLICATION FOR PERMIT TO OPERATE AUSTIN ROAD <br /> LANDFILL SITE <br /> Item #1 - Standby Equipment : <br /> The following pieces of excess equipment are stored at the <br /> Austin Road site and are available as standby equipment : one <br /> crawler tractor, D- 8 ; one scraper (18-yard) . All the equipment <br /> in use at the Austin Road landfill site is manufactured by <br /> Caterpillar Tractor Company and parts are available from Holt <br /> Bros. in Stockton, California. <br /> Item #2 - Fire Protection: <br /> The primary method of fire control at the site involves the use <br /> of soils and dirt moving equipment. Stockpiles of dirt are <br /> maintained at strategic locations , and the two D-8 crawler <br /> tractors are available for moving this dirt in an emergency. <br /> In addition to these two pieces of equipment, the compactor <br /> used on the landfill site can double as a loader if necessary. <br /> A 5, 000-gallon pressure water tank is filled and under pressure <br /> at all times at the site, and fittings on this tank are compatible <br /> with those commonly used by firefighting agencies. <br /> Item #3 - Total Acreage at the Site : <br /> The total acreage at the site is 180 acres . <br /> Item #4 - Monitoring of Leachate : <br /> The monitoring of leachate will take place semi-annually, in June <br /> and December, and chemical analysis will check the bacteriological <br />
The URL can be used to link to this page
Your browser does not support the video tag.