Laserfiche WebLink
0 <br /> SOLID WASTE FACILITY PERMIT APPLICATION 7 AUSTIN ROAD LANDFILL SITE <br /> � Item #1 . The Austin Road landfill is a 1�& .` ite operated <br /> 1. <br /> by the separate trenph, method; a distance of 28 feet from center <br /> to center is maintained between trenches . A daily cover- of six <br /> irichep is applied at the end of each working day thus forming <br /> cells . The final cover is threefeetin depth. Excavation of <br /> new trench is kept as close to the working face as possible to <br /> facilitate application of a daily cover as soon as possible after <br /> compaction. Excavation is performed with a hydraulic excavator. <br /> All required cover material is available on the site. <br /> Cell width is the same as the trench spacing, 28 feet, and <br /> runs the full width of the landfill site, varying from 1 ,000 <br /> to 2, 600 feet. Compaction is accomplished with a compactor work- <br /> ing four to six hours daily. A typical cycle is difficult to <br /> describe because the same operator operates the push tractor and <br /> the compactor, with the operator of the excavator helping with <br /> both the push tractor and the compactor when he has time avail- <br /> able. Compact iQn,_..t9_j:000_pounds, <br /> :,per. cubic fo ` ,-is.-._the,,minimum <br /> a.�eep�e� ia� place .:.dens its. <br /> A.. <br /> A. The normal hours of operation-..'are between 6: 30 a.m. and <br /> 4: 30 p,m, each day except Saturday`',,and Sunday. The hours of <br /> operation on Saturday are 6 : �b a.m. to 1 : 30 p.m. The site is <br /> closed Sundays , Christmas 'Day and New Year° s Day. <br /> Jr <br /> There are o plans for wast , } hdi�n o sepratoD at the <br /> landfill site. 'Y <br />