Laserfiche WebLink
s November 20, 1990 <br /> 9 <br /> a <br /> Ed Padilla <br /> Senior Environmental Health Specialist <br /> San Joaquin Local Health District <br /> 445 N. San Joaquin Street <br /> Stockton , CA 95201 <br /> RE: Winterization Plan for Austin Road Sanitary Landfill <br /> Mr . Ed Padilla : <br /> The following Winterization Plan is submitted for review. <br /> I . LOCATION AND DESCRIPTION OF WINTER DISPOSAL SITE <br /> The location of the disposal area will be between stations <br /> 21+00 and 23+00 as shown on the topographic base map . <br /> The amount of waste to be received is based on a projected <br /> scale volume of waste of 44 , 000 tons for the 1990/91 seasonal <br /> duration of 4 months . THe waste fill volumes have been <br /> compiled by using 15 foot lift above existing grades with <br /> side slopes of 3 : 1 and a 3% grade slope . If sufficient space <br /> is not available for the duration period , we have an alternate <br /> winter pad located at station 34+00 and can use the same access <br /> road . <br /> II . WINTERIZATION PAD AND ACCESS ROAD <br /> The pad is made up of a concrete and asphalt chip base <br /> approximately 4 feet thick with a 6" asphalt top layer . <br /> The dimensions of the pad are 200X100 feet and it provides <br /> sufficient maneuverability for vehicle travel and unload- <br /> ing operations . The access road is asphalt and 20 feet wide . <br /> It provides vehicles access to and from the winter pad . <br /> III . DRAINAGE <br /> WE have an intermediate grading plan which was submitted <br /> and approved on 9/21/90 by the State Water Quality Control Board . <br /> With the 3% grade slope and the 3 : 1 side slopes , the storm <br /> water will drain off the top of the landfill to the toe . <br /> IV. BORROW STOCKPILE <br /> We have a 2 , 000 cubic yard stockpile adjacent to the winter <br /> dumping area . If more is needed , we will replenish it during <br /> periods of dry weather . <br /> V. SUMMARY <br /> This Winterization Plan is designed to provide continual and <br /> uninterrupted service for the winter of 1990/91 ; with proper <br /> drainage , refuse space , and cover material in mind . <br /> 9 <br /> Thank o - -' <br /> P it G K b stiani <br /> cc: Stephen Chen Pres . -Gambi Ent . , Inc . <br />