My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1989-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 9:40:02 AM
Creation date
7/3/2020 10:39:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-1996
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1989-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S 7 1."- C:< <br />gA <br />--Z <br />OF PUBLIC14VORKS <br />CITY Y HALL <br />-25 N. ELEE)PAEO STRE:E=- <br />S-CCKTCN, CA 9 -202-1 S97 <br />June 8, 1993 <br />California Regional Water Quality Control Board, <br />Central Valley Region <br />3443 Routier Road <br />Sacramento, CA. 95827-3098 <br />Attn: Robert A. Evans, Area Engineer <br />AUSTIN ROAD LANDFILL GROUNDWATER EXTRACTION AND TREATMENT SYSTEM <br />The City of Stockton has awarded the Austin Road Landfill <br />Extraction and Treatment construction project to Russell <br />Mechanical, Inc., Rancho Cordova, CA. on May 24, 1993. <br />Listed below is the proposed timetable for the project: <br />June 21, 1993 ... Submit signed contract, Labor, Material and <br />Performance Bonds. <br />June <br />28, <br />1993 ... <br />Prejob <br />construction meeting. <br />July <br />12, <br />1993 ... <br />Submit <br />shop drawings, start grading project site. <br />Setember 24, 1993... Complete construction and begin testing <br />equipment. <br />October 6, 1993—Project completion. <br />If you should have any questions regarding this timetable, please <br />call me at (209) 944-8826. <br />Mike Miller <br />Solid Waste Manager <br />cc: Amalia Fernandez, Permitting Section, <br />California Integrated Waste Board <br />Ed Padilla, San Joaquin County Environmental Health <br />Stephen Chen, Deputy Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.