Laserfiche WebLink
6 <br />eive off site fill dirt from different sources. <br />V. SUMMARY <br />This Winterization Plan is designed for seasonal operations for the 1992-93 <br />winter. In addition, adequate drainage, refuse space, and cover material <br />are provided to insure limited maintenance and normal operation of the <br />landfill. <br />cc: Stephen Chen - City of Stockton <br />Th you <br />h;i I iamvbastiani <br />Pres. - GAMBI ENT., INC. <br />