Laserfiche WebLink
A-2 <br />Upon completion of the drilling and soil sampling, each borehole will be pressure grouted <br />with a six -sack sand -cement slurry with approximately 5 percent bentonite to site grade. Soil <br />cuttings from the borings will be sealed in United States Department of Transportation <br />(DOT) approved 55 -gallon steel drums. The drums will be labeled with information on the <br />source of their contents and stored on site in a location remote from public access. The <br />disposal of the drill cuttings is discussed below. <br />A-2 Decontamination: Decontamination procedures will be implemented to reduce the <br />potential for cross -contamination between soil borings. <br />Before, during, and following drilling operations, the augers and associated drilling and <br />sampling equipment will be thoroughly cleaned using a high pressure hot water (steam) <br />washer. The hot water washer has a pressure of approximately 1,200 pounds per square <br />inch and a water temperature of approximately 100 degrees Centigrade (°C). The sampler <br />and brass sleeves will be washed in a Alconox® detergent solution, rinsed with clean tap <br />water, and air-dried prior to initial use and between each sampling event. The augers will <br />be steam cleaned prior to the drilling of each soil boring. <br />Prior to construction of monitoring wells, all casings will be cleaned in the same manner as <br />the drilling equipment. <br />A-3 Groundwater Monitoring Well Installation: Twining is a C-57 <br />licensed water well drilling contractor (Contractor's License No. 506159). The groundwater <br />monitoring wells will be installed under the direction of a California -registered geologist or - <br />certified professional engineer. <br />Soil borings for monitoring wells will be drilled and sampled according to Twining's <br />"Standard Operating Procedures for Drilling and Soil Sampling". Equipment used for <br />drilling, sampling, and constructing wells, and well construction materials will be thoroughly <br />cleaned according to Twining's "Standard Operating Procedures for Equipment <br />Decontamination". <br />Groundwater monitoring wells will be constructed of minimum Schedule 40 polyvinyl <br />chloride (PVC), stainless steel, or other material casing. Screen may be machine -slotted or <br />wire -wrapped. Casing and well screen specifications will depend upon project objectives, <br />site conditions, and project budgets. The well screen and casing sections will be joined by <br />factory -made flush -threaded connections. <br />The well filter pack material will consist of appropriately -sized pre -washed sand. The filter <br />material will be placed in the annulus between the boring wall, from the bottom of the <br />boring to approximately 2 feet above the top of the screen. Subsequent to filter pack <br />emplacement, preliminary development may be performed to provide a uniform filter pack <br />about the casing. Above the filter pack, a 2- to 4 -foot thick bentonite seal will be installed. <br />