My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1991-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 10:53:56 AM
Creation date
7/3/2020 10:39:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-1997
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1991-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />CITY OF STOCKTON <br />X <br />DEPARTMENT OF PUBLIC WORKS <br />CITY HALL <br />425 N. EL DORADO STREET <br />STOCKTON, CA 95202-1997 <br />October 27, 1995 <br />Mr. Timothy Crist, P.E. <br />Closure and Remediation Branch <br />California Integrated Waste Management Board <br />8800 Cal Center Drive <br />Sacramento, CA 95826 <br />The purpose of this letter is to provide the information requested under item #2 of your letter <br />dated September 27, 1995. Item #2 of your letter requested submission, within four weeks, of a <br />schedule for accomplishing the following tasks: <br />a. Date for securing a revised contract with Pacific Energy for maintaining and <br />installing gas control facilities for the expansion project. <br />b. Installation of additional gas monitoring probes to determine whether or not gas is <br />migrating off site. <br />C. Responding to comments from the CIWMB and LEA on the subject plans. <br />r <br />With respect to the installation of additional gas monitoring wells (SGP5A & SGP6A), this work <br />was accomplished on June 27, 1995. Attached is a copy of the third quarter monitoring results <br />for all of the gas wells at the Austin Road Landfill including the two new wells. As is noted on <br />the attached report, there is no detection of methane gas at the new well sites. <br />The remaining two items should be accomplished within 90 days. Therefore, the completion <br />date for "a" and "c" will be January 31, 1996. If you have any questions, please contact Mike <br />Miller at (209) 937-8826. <br />STEPHEN CHEN <br />DEPUTY PUBLIC WORKSDIRECTOR/SOLID <br />cc: Ed Padilla, San Joaquin County Environmental Health <br />CALIFOPNIAYS SUNRISE SEAPORT" <br />f <br />¢j <br />M4 /j g <br />The purpose of this letter is to provide the information requested under item #2 of your letter <br />dated September 27, 1995. Item #2 of your letter requested submission, within four weeks, of a <br />schedule for accomplishing the following tasks: <br />a. Date for securing a revised contract with Pacific Energy for maintaining and <br />installing gas control facilities for the expansion project. <br />b. Installation of additional gas monitoring probes to determine whether or not gas is <br />migrating off site. <br />C. Responding to comments from the CIWMB and LEA on the subject plans. <br />r <br />With respect to the installation of additional gas monitoring wells (SGP5A & SGP6A), this work <br />was accomplished on June 27, 1995. Attached is a copy of the third quarter monitoring results <br />for all of the gas wells at the Austin Road Landfill including the two new wells. As is noted on <br />the attached report, there is no detection of methane gas at the new well sites. <br />The remaining two items should be accomplished within 90 days. Therefore, the completion <br />date for "a" and "c" will be January 31, 1996. If you have any questions, please contact Mike <br />Miller at (209) 937-8826. <br />STEPHEN CHEN <br />DEPUTY PUBLIC WORKSDIRECTOR/SOLID <br />cc: Ed Padilla, San Joaquin County Environmental Health <br />CALIFOPNIAYS SUNRISE SEAPORT" <br />
The URL can be used to link to this page
Your browser does not support the video tag.