Laserfiche WebLink
4 <br /> AUSTIN ROAD LANDFILL EXPANSION <br /> REPORT OF DISPOSAL SITE INFORMATION (RDSI) MATRIX <br /> 7. Gas Management <br /> Plan <br /> 8. Groundwater <br /> Monitoring Plan <br /> 9. Representative <br /> Cross Sections <br /> 10. Design Details <br /> B. DESIGN <br /> CALCULATIONS <br /> 1. Site Capacity <br /> 2. Soil Availability <br /> 3. Seismic Stability <br /> 4. Settlement Analysis <br /> 5. Leachate Generation <br /> 6. Drainage System <br /> Capacity Requirements <br /> 7. Gas Generation and <br /> Air Emission <br /> Calculations <br /> 8. Soil Erosion Analysis <br /> IV. DISPOSAL SITE <br /> IMPROVEMENTS <br /> V. DISPOSAL SITE <br /> OPERATIONS <br /> A. HOURS OF <br /> OPERATION <br /> B. PERSONNEL <br /> 1. Minimum Numbers <br /> and Qualifications <br /> 2. Training <br /> C. EQUIPMENT <br /> 1. Minimum Equipment <br /> Requirements <br /> 2. Standby Equipment <br /> 3. Equipment <br /> Preventative <br /> Maintenance <br /> D. MATERIALS <br /> HANDLING ACTIVITIES <br /> 1. Construction <br /> —Sequencing <br /> 2. Unloading <br /> 3. Spreading and <br /> Compacting <br /> 4. Special Handling <br /> Procedures <br /> 5. Periodic Cover <br /> 6. Intermediate Cover <br /> Placement <br /> 7. Final Cover <br /> Placement <br /> 8. Cover Availability <br /> E. SALVAGING AND <br /> VOLUME REDUCTION <br /> 1. Salvaging . <br /> 2. Storage of Salvage <br /> 3. Removal of Salvage <br /> 4. Non-Salva eable <br /> C:IAAPFIAUSTION\RDSIMTRX.DOC 5/14/95 2:31 PM PAGE 3 <br />