My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 8:55:58 AM
Creation date
7/3/2020 10:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Austin Road Landfill E "on Project <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> with, and to the satisfaction of,CDFG <br /> and USFWS. Conditions attached to the <br /> CDFG Streambed Alteration Agreement <br /> shall be incorporated into the wetlands <br /> plan and implemented accordingly. <br /> (c)The following Pre-construction and <br /> construction measures should be <br /> implemented to salvage individuals and <br /> to minimize and avoid take. These <br /> measures are consistent with the recently <br /> released SJMSCP(Public Review Draft, <br /> September 23, 1999). <br /> -Construction shall occur during the <br /> active period for the snake,between May <br /> 1 and October 1. Between October 2nd <br /> and April 30th,the JPA with the <br /> concurrence of the Permitting Agencies' <br /> representatives on the TAC,shall <br /> determine if additional measures are <br /> necessary to minimize and avoid take. <br /> -Limit vegetation clearing within 200 <br /> feet of the banks of occupied giant garter <br /> snake aquatic habitat to the minimal area <br /> necessary. <br /> -Confine the movement of heavy <br /> equipment within 200 feet of the banks of <br /> occupied giant garter snake aquatic <br /> habitat to existing roadways to minimize <br /> habitat disturbance. <br /> -Prior to ground disturbance, all on-site <br /> construction personal shall be given <br /> instruction regarding the presence of <br /> SJMSCP-covered species and the <br /> importance of avoiding impacts to these <br /> species and their habitats. <br /> -If on-site wetlands,irrigation ditches, <br /> marshes,etc. are being relocated in the <br /> vicinity:the newly created aquatic habitat <br /> shall be created and filled with water <br /> prior to dewatering and destroying the <br /> pre-existing aquatic habitat. In addition, <br /> non-predatory fish species that exist in <br /> the Nuatic habitat and which are to be <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.