My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 8:55:58 AM
Creation date
7/3/2020 10:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Austin Road Landfill Ex6ion Project <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURE LEVEL OF <br /> SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> contribute to increased peak flows designed to handle the 100-year storm. <br /> downstream,or degrade surface water in <br /> receiving waters. (SIGNIFICANT) (b) Stormwater runoff from the working <br /> face would be collected at the edges of the <br /> landfill and routed to the perimeter <br /> leachate collection trenches. <br /> (c)The timing of the pumped discharge <br /> from the detention ponds must not occur <br /> with the peak flow rate of Little Johns <br /> Creek as this would impact downstream <br /> locations by increasing the flood hazard. <br /> Telemetry,which monitors the flow in the <br /> Creek to determine the peak, should then <br /> be used to coordinate the start up of the <br /> PUMPS. <br /> KA. Uncontrolled erosion from soil (a)The final bridge design shall include LS <br /> stockpiles and landfill surfaces,or structural controls to prevent spilled or <br /> inadvertent spills of refuse or other tracked sediment from entering the stream <br /> substances on-site could contaminate channel, and shall be regularly cleared of <br /> surface water. (SIGNIFICANT) accumulated sediment and refuse. <br /> Accumulated material shall be properly <br /> disposed of in the landfill. <br /> (b)Additional measures described in <br /> Section III.G,Air Quality,Mitigation <br /> Measure G.1,would also minimize dust <br /> impacts. <br /> K.S. Groundwater contamination would (a) Landfill design includes a separation LS <br /> result if the liner and leachate collection between the liner and groundwater that <br /> system for the expansion failed. meets all regulatory standards. <br /> (SIGNIFICANT) <br /> (b) The liner and leachate collection <br /> systems for the expansion have been <br /> designed to meet or exceed the regulatory <br /> requirements. <br /> (c) The project includes a leak detection <br /> system,a series of secondary collection <br /> trenches beneath the liner and directly <br /> under the leachate collection trenches. <br /> (d)The operator would remove hazardous <br /> materials spotted during delivery,thus <br /> minimizing the 2otential for leachate <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.