WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2002-0121 -7- <br /> FOR FORWARD INC. <br /> AUSTIN ROAD LANDFILL <br /> CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 3. All water supply wells within 500 feet of the landfill shall be sealed or abandoned to <br /> the satisfaction of the San Joaquin County Public Health Services Department prior <br /> to the discharge of waste to the landfill. A record of the sealing and/or abandonment <br /> of such wells shall be sent to the Board and to the State Department of Water <br /> Resources. <br /> 4. Neither the treatment nor the discharge of wastes shall cause a pollution or nuisance <br /> as defined by the California Water Code, Section 13050. <br /> General Waste Management Unit Construction <br /> 5. Landfill covers shall be constructed in compliance with the requirements of Title 27. <br /> 6. LCRSs shall be designed, constructed and maintained to collect twice the anticipated <br /> daily volume of leachate generated by the landfill and to prevent the buildup of <br /> hydraulic head on the underlying natural geologic materials of low hydraulic <br /> conductivity. The depth of fluid in any LCRS sump shall be maintained as low as <br /> feasible and no greater than the minimum needed for safe pump operation. <br /> 7. Each landfill unit constructed after the effective date of this Order shall be designed <br /> and constructed to comply with the appropriate performance standards in Title 27 and <br /> approved by Board staff prior to operation. Prior to the beginning of construction for <br /> each new construction phase, a Final Design Report shall be submitted to Board Staff <br /> for review and approval and shall include,but not be limited to, the engineered design <br /> plans for the WMU, the contract specifications, and a construction quality assurance <br /> (CQA) plan to verify that construction specifications will be met. Additionally, a <br /> revised water quality monitoring plan may be required if necessary. Approval of the <br /> final design report shall be obtained from Board staff prior to construction of the <br /> landfill liner or cap. A final construction report shall be submitted for approval by <br /> Board staff after each phase of construction and prior to the discharge of waste into <br /> the constructed phase. The final construction report shall include,but not be limited <br /> to, as-built plans for the WW, a CQA report with a written summary of the CQA <br /> program and all test results, analyses, and copies of the inspector's original field notes, <br /> and a certification as described in the Standard Provisions and Reporting <br /> Requirements. <br />