Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2003-0049 -10- <br /> FORWARD INC. AND ALLIED WASTE INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS II LANDFILL <br /> SAN JOAQUIN COUNTY <br /> CONSTRUCTION AND ENGINEERED ALTERNATIVE <br /> 43. On 17 June 1993, the State Water Resources Control Board adopted Resolution No. 93-62 <br /> implementing a State Policy for the construction, monitoring, and operation of municipal <br /> solid waste landfills that is consistent with the federal municipal solid waste regulations <br /> promulgated under Title 40, Code of Federal Regulations,Part 258 (Subtitle D). <br /> 44. Resolution No. 93-62 requires the construction of a specified composite liner system at new <br /> municipal solid waste landfills, or expansion areas of existing municipal solid waste landfills, <br /> that receive wastes after 9 October 1993. <br /> 45. Resolution No. 93-62 also allows the Board to consider the approval of engineered <br /> alternatives to the prescriptive standard. Section III.A.b. of Resolution No. 93-62 requires <br /> that the engineered alternative liner systems be of a composite design similar to the <br /> prescriptive standard. <br /> 46. Section 13360(a)(1) of the California Water Code allows the Board to specify the design, <br /> type of construction, and/or particular manner in which compliance must be met in waste <br /> discharge requirements or orders for the discharge of waste at solid waste disposal facilities. <br /> 47. The Discharger proposes a liner system which will be designed, constructed, and operated to <br /> prevent migration of wastes from the Unit to adjacent natural geologic materials, <br /> groundwater, or surface water during disposal operations, closure, and the post-closure <br /> maintenance period in accordance with the criteria set forth in Title 27 for a Class II landfill, <br /> and the provisions in State Water Resources Control Board Resolution No. 93-62 for <br /> municipal solid wastes. <br /> 48. The Discharger submitted a Report of Waste Discharge and a Liner Performance <br /> Demonstration requesting approval of a single composite liner. <br /> 49. The single composite liner design proposed by the Discharger for the bottom liner of the Unit <br /> consists of, in ascending order: a prepared subgrade; a 24-inch thick, low-permeability soil <br /> layer(minimum permeability of 1 X 10"7 cm/sec); a 60-mil high density polyethylene <br /> (HDPE) geomembrane; a 12-ounce/square yard cushion geotextile(may be omitted if the <br /> LCRS gravel is sub-angular to rounded); a 12-inch LCRS gravel drainage layer; an B- <br /> ounce/square yard separator geotextile; and a 12-inch thick protective cover soil operations <br /> layer. <br /> 50. The single composite liner design proposed by the Discharger for the side slope liner is to be <br /> constructed of, in ascending order: a prepared subgrade; a GCL or a 24-inch thick low <br /> permeability soil layer (minimum permeability of the soil 1 X 10.7 cm/sec); a geocomposite <br /> drainage net; and a 12-inch thick protective cover soil operations layer. <br />