My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 8:55:58 AM
Creation date
7/3/2020 10:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 R e <br /> Fourth r 1999 <br /> Soil Gas Monitoringfor <br /> Austin fill and FrenchLandfill <br /> 1.0 Introduction <br /> Methane and oxygen gas concentrations are measured quarterly in all soil gas probes at the <br /> City of Stockton(City)Austin Road Landfill and French Camp Landfill. Results of these <br /> analyses for fourth quarter 1999 are presented in this report. <br /> 2.0 Austin Road Landfill <br /> Methane and oxygen measurements were collected at soil gas probes during sampling <br /> events in November 1999 and January 2000. (The field worksheets are attached at the end of <br /> this report.)Soil gas probe locations are shown on Figure 1,and the monitoring results are <br /> presented in Table 1.Probes 3B,7A,8A,9A,and 10B were installed in December 1999 and <br /> were first sampled on January 7,2000.Initial soil gas sampling data for the new probes are <br /> included in this report. All other probes were sampled on November 15, 1999. <br /> Methane was not detected at any of the soil gas probes.Because the landfill did not operate <br /> after October 1999,the scalehouse operations office was not occupied or sampled during the <br /> November and January sampling events. The employee lunchroom trailer and both storage <br /> containers have been removed from the landfill and therefore were not sampled for landfill <br /> gas. <br /> 3.0 French Camp Landfill <br /> The fourth quarter 1999 soil gas monitoring results for French Camp Landfill are presented <br /> in Table 2. Methane and oxygen measurements were collected at soil gas probes during <br /> sampling events in November 1999 and January 2000.Soil gas probe locations for French <br /> Camp Landfill are shown on Figure 2. (The field worksheets are attached at the end of this <br /> report.) Probes 4A,5A,6A,and 8A were installed in October 1999. These probes were first <br /> sampled on January 7,2000,and the data are included in this report. However,SGP-8A has <br /> been vandalized and could not be sampled. All other probes were sampled on November <br /> 15, 1999. <br /> No methane was detected at any of the soil gas probes or in the scalehouse.Only one of the <br /> storage containers could be sampled in November 1999,and no methane was detected;the <br /> other container was locked.As of January 2000,both storage containers have been removed <br /> from the landfill and therefore were not sampled for landfill gas. <br /> RDD/003670064.DOC(WPT144.DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.