My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1996-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 8:55:58 AM
Creation date
7/3/2020 10:39:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2003
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Austin Road Landfill Landfill Ga_ _ ration and Control Evaluation, <br /> Alternative 2 will be developed during the design phase of the project. Additional evaluation of the <br /> existing gas extraction system is required to determine that sufficient system vacuum is available to <br /> install additional wells on the system. A high priority is to assure that existing off-site migration <br /> control along the western portion of the northern boundary is not compromised by the addition of <br /> the new extraction wells. <br /> IV. Implementation Plan <br /> Design of the Alternative 2 gas system expansion is currently underway. A technical memorandum <br /> documenting the system features;well spacing,well construction details,and header line sizing will <br /> be prepared prior to the development of construction plans and specifications. Input from the gas <br /> system operators,Ogden Power,will be obtained to facilitate system development. Plans and <br /> specifications will be completed by August 14, 1998 in accordance with the compliance schedule. <br /> The next project status report to be submitted to the Board is scheduled for August 24, 1998. <br /> CDM Camp Dresser&McKee 5 <br /> wsansoao15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.