Laserfiche WebLink
r j <br /> ATTACHMENT 1 <br /> Proposed Austin Road Landfill Gas (LFG) Control Schedule <br /> Task Est Completion <br /> Date <br /> 1. Retain engineer. May 26, 1998 <br /> 2. Determine extent of LFG migration plume and June 30, 1998 <br /> evaluate LFG control options. <br /> 3. Prepare plans and specifications for Aug.14, 1998 <br /> installation of LFG control system and LFG <br /> operations plan. <br /> 4. Procure construction/installation services. Sept. 29, 1998 <br /> 5. Complete installation of system. Nov. 13, 1998 <br /> T:\WPWIN\SOLIDWSTWIKE\AUSTINRD\LFG-SCHD.WPD <br />