Laserfiche WebLink
NOV-06-2e00 15:31 FROM CA INTEGRATED WASTE MGNT TO 912094688392 P.02 <br /> SCH#9002207 18 Forward InclAustin Road Landfill Project Page 2 of 3 <br /> management firm whiob owns,ihe adjacent Forward Resource Recovery Facility has indicated, <br /> that as Part of die Project,the` dge" area between the Austin Road Landfill and the Forward <br /> Resource Recovery I-acility will belandfilled.,thus creating one contiguous landfill. <br /> FRS staff has identified several potentially significant environmental effects regarding the intent <br /> to landfill the"wedge" area between the two facilities. <br /> 1. Landfilling the"w ge"area would increase the life of the Project beyond the <br /> 49 y cited in the both the Supplemental.EI R and the EIR for the Austin.Road <br /> Landfill Expansion Project. <br /> 2. Changes to docurneats such as the General and Master Plans and the County. <br /> Integrated Waste Magement Plan for the County ot'S an Jo um,may be required to <br /> considered the extended life of the project. <br /> 3. Changes and/or development of engineering designs,to address issues such as <br /> leachate.methane g and compaction may be required. <br /> The above potentially signific environmental effects would effect The Project as a whole and <br /> consequently should be discuss d in an environmental document of appropriate level. <br /> Per CEQA Guidelines,Section 15060,the Lead Agency,while con ducting a preliminary review, <br /> should be alert for environmen issues that might require preparation of an EIR. Additionally, <br /> CEQA Ouidebots,Section 154,provides criteria for determining the significance of the <br /> environmental effects caused b a project.Furthermore,per CEQA Guidelines, Section 15084, <br /> the Lead Agency may require the project applicant to supply data and information to determine <br /> whether the project may have significant effect on the environment. <br /> The CIWMB, as a responsible envy, complies with CEQA by considering the environmental <br /> document prepared by the LeaA Agency and by reaching its own conclusions on whether and <br /> how to approve the project invdlved, per CEQA Guidelines, Section 15096. <br /> I <br /> We hope that this information will be helpful to your agency in determining the appropriate <br /> environmental document to hedeveloped for the Prvject. Should you have any questions,please <br /> contact John lilac as,(916)2 5-3880, <br /> Sincerely, <br /> John Macanas <br /> Environmental Review Section <br /> re fitting and Inspection Branch <br /> permitting and Enforcement Division <br /> CIWMB <br />