My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:40:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_2
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VM <br />■ Completely excavate and grade the new channel before fall and winter rains (before <br />October 31). Earthen dams must remain at both points of connection to the existing <br />channel (Figure 3-2). Construct erosion -control measures, completely in place, before <br />October 31. <br />• • • • , •,. • •. , . , • <br />■ Open the downstream dam before the winter rains (before November 30) to allow <br />pressure to equalize between the new channel and the existing channel. <br />.. • the upstream fam after the heavy spring flows (before April 30) to establish• <br />summer flows into the upstream diversion point in the new channel. These flows will <br />gradually • the followingseason. <br />Construct permanent dam structurethe upstream channel diversion point during <br />the <br />dry season (before October 31) followed by construction of a second permanent dam <br />structure at thedownstreamdiversion point. <br />n Complete dewatering and earthen fill and stabilization operations for the existing channi <br />before the start of the rainy season (before October 3 1). <br />IAWK611111111111TAIJ, <br />Within 60 days of completion of mitigation construction, the City will submit to the Co <br />records <br />.. • 1 F "as-built"drawings documenting theconstructed channel <br />realigrunent, <br />• t:1 i <br />topography,andmitigationplantings. The <br />topography •the mitigation be delineated <br />-foot• 1 <br />Maintenance of planted material will include checking each planting location once every <br />2 weeks during the first year's growing season (March 1 -June 1) to examine plant vigor, plant <br />protection devices, weed growth, the stability of watering basins. Maintenance of native -grass cover <br />crop will include eradicating exotic and noxious weeds, protecting embankments and ditches from <br />erosion, and protecting seeded areas from vehicular c. Irrigation system maintenance will include <br />clearing weeds around the overhead spray sprinklers, cleaning sprinkler heads and drip emitters as <br />necessary, repairing damaged potions of the system, and ensuring that each plant is receiving <br />adequate irrigation. <br />Wetland Mitigation and Monitoring Plan for the Chapter 3. Wetland Mitigation and Monitoring Plan <br />Austin Road landfill Expansion. <br />U. S. Armc Corps of Engineers File 199400974 <br />Cin" of Stockton 3-6 April S. 1996 <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.