Laserfiche WebLink
Section No: 7 <br />Page: 4 of 6 <br />Revision No: 2.0 <br />Date: January 15, 1994 <br />7.3.5 Transfer samples and analyses worksheets; to the proper refrigerator or lab work <br />distribution area. <br />7.4 Sample Storage <br />All samples are retained for a minimum of 30 days except for microbiological samples <br />which are held for a shorter time. A longer storage period can be arranged at the request <br />of the client. <br />7.5 Sample Disposal <br />All samples which are considered to be potentiaUy hazardous based upon analytical results <br />or matrix, will be disposed of by lab packing. Extremely hazardous samples may be <br />returned to the client for disposal. All disposal arrangements should be made with a <br />project manager. <br />7.6 Subcontracted Lab Work <br />On occasion, laboratory work may need to be subcontracted to certified labs approved by <br />FGL Environmental. Prior to subcontracting the client will be notified. Under no <br />circumstances will work be subcontracted without client requirements being met. When <br />work is subcontracted, it is done so under chain of custody, and the proper records are <br />included with the data package. <br />IM <br />11 <br />a <br />