Laserfiche WebLink
NOV-06-2000 14:28 FROM CA INTEGRATED WASTE MGNT TO 912094640138 P.02 <br /> SCH.#9002207 IS Forward InOAtmin I Load Landffll Prqject Page 2 of 3 <br /> management firm which owns adjacent Forward Resource Recovery Facility has cated, <br /> that as part of the Project,the" edge"area between the Austin Road Landfill and the Forward <br /> Resource Recovery Facility wi 1 be 1 14 thus creating OnO COntigaous landfill. <br /> ERS staff has identifiedsever al otentially sig nificantenviroinnental effects regarding the intent <br /> to landfill the"wedge"area be ween the two facilities. <br /> 1. Landfil ling the"wevil;c"area would increase the life of the Proj ezt beyond the <br /> 48 years cited in thtch the Supplemental EIR and the EIR for the Austin Road <br /> L 0 <br /> Landfill Expamion Ject. <br /> 2, Changes to docume S such as the General and Master Plans and the County. <br /> Integrated WaWste M, gement Plan for the County of San Joaquin may be required to <br /> considered the ex"ed life of the project. <br /> 3. Changes and/or deve.opment of engineering designs to address issues such as <br /> leachate,methane ga,i,and compaction may be required. <br /> The above potentially signfflificaa ,envirommental,effects would effect theProject as a whole and <br /> consequently should be discuss o I in an environmental document of appropriate level. <br /> Per CEQA Guidelines, Section 15060,the Lead Agency,while conducting a preliminary review, <br /> should be alert for issues that might require preparation of an EIR.Additionally, <br /> ClQA Guidelines, Secefion 15t 4,provides crit `a for determining the significance of the <br /> environmental effects caused a project. Finthermore,per CEA Guidelines, Section 15084, <br /> the Lead Agency may reg "re ti project applicant to supply data and infbmiation to determine <br /> whether the project may have a a ignificant.effL,,d on the en t. <br /> 7be CIWMB,as a responsible cy, with CFQA by considering the environmental <br /> document prepared by theL ency and by reaching its own conclusions on whether and <br /> how to approve the project inOlved,per CEA Guidelines,Section 15096. <br /> We hope that this information A be help fid to your agency in d the appropri�te <br /> environ menta)document to be,1i-veloped for the Project. Should you have any questions,please <br /> contact John Macanas, (916)2 !-3880,iMRCaa4S@CiWMb.Ca.gOV. <br /> Sincerely, <br /> John macanas <br /> EnvironxnenlaJ Review Section <br /> Permitting and Inspection Bran <br /> Pemitting and Enfbrcemeut DiAsion <br /> Ciwi�ffl <br />