Laserfiche WebLink
III.A.9. Representative Cross <br />Five representative landfill cross sections are shown ort <br />Appendix B, <br />Sections <br />Drawing P5. These sections show the existing landfill, the <br />CEP Dwg. P5 <br />vertical and horizontal expansion phases, and the final landfill <br />grade. Sections A, B, C, and D are cut north-south through a <br />leachate collection trench and sump for Phases I, II, III, and IV <br />respectively. Section F is cut east-west through Phases I, II, <br />III, and IV showing the drainage slope to the leachate <br />collection trenches, the top of the landfill is shown as a <br />projection beyond the section cut. <br />Sections show specific design elements of the liner, leachate <br />collection system, cover system, surface water system are <br />discussed in Section 1- below. <br />III.A.10. Design Details <br />23 CCR 2542 (Liner <br />Liner S sy tem: Liner system is a composite liner consisting of <br />Appendix B, <br />System) <br />a 2 foot clay liner (max. permeability 1 x 10-7 cm/sec) overlaid <br />CEP Dwg. P6 <br />by a geomembrane. For final design, a geosynthetic clay liner <br />Appendix I, FDSR <br />(GCL) may be substituted for the 2 foot clay liner. See <br />Sec. 1.3.3, Pages <br />Drawing P6 for typical liner details. <br />1-8 to 1-9 <br />14 CCR 17773, <br />Final Cover - Existing Landfill: Final covering existing landfill <br />Appendix B, <br />23 CCR 2581 (Final Cover) <br />areas would consist of a 2-foot foundation layer and a 1-foot <br />CEP Dwg. P6 <br />minimum soil barrier (max. permeability 1 x 10-6 cm/sec) with <br />Appendix I, FDSR <br />a 1-foot minimum topsoil layer. <br />Sec. 1.5.3 Page 1-17 ' <br />Final Cover - Expansion Landfill: Final cover for expansion <br />landfill areas will consist of a composite cover system an 18 <br />inch foundation layer (max. permeability 1 x 10-6 cm/sec), a <br />geomembrane, and an 18 inch soil cover layer. For final <br />design, a geosynthetic clay liner (GCL) may be substituted for <br />the low permeability foundation layer or the soil barrier layer. <br />See Drawing P6 for typical cover details. <br />