My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:41:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY CLOSURE PLAN <br /> FOOTHILL SANITARY LANDFILL <br /> TABLE OF CONTENTS <br /> I . ENGINEERS CERTIFICATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> II. PRELIMINARY CLOSURE PLAN <br /> Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> Excavation and Fill Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . .2 <br /> Current Monitoring and Control Systems . . . . . . . . . . . . . . . . . 4 <br /> Ground Water <br /> Nuisance and Health Factors. . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 <br /> Security <br /> Dust <br /> Litter <br /> Fires <br /> CurrentLand Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> Site Life Estimate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> Maximum Extent Requiring Closure . . . . . . . . . . . . . . . . . . . . . . 12 <br /> Structure Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> Decommissioning Environmental Controls . . . . . . . . . . . . . . . . 12 <br /> Site Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> Final Cover . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . 13 <br /> Final Grading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 <br /> FinalSite Face . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 <br /> DrainageControl. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 <br /> Slope Protection and Erosion Control . . . . . . . . . . . . . . . . . . 15 <br /> Leachate Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 <br /> Installation of Groundwater Monitoring Network . . . . . . . . 16 <br /> Installation of Landfill Gas Monitoring Network . . . . . . . 16 <br /> III. PRELIMINARY CLOSURE COSTS <br /> Final Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 <br /> Construction Quality Assurance . . . . . . . . . . . . . . . . . . . . . . 21 <br /> Fill Open Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 <br /> Revegetation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 <br /> Gas Monitoring System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 <br /> Leachate Control Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 <br /> Drainage System Installation . . . . . . . . . . . . . . . . . . . . . . . . 24 <br /> Adding or Removing Security Systems. . . . . . . . . . . . . . . . . . 25 <br /> Structure Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 <br /> Dismantling Environmental Controls . . . . . . . . . . . . . . . . . . 25 <br /> Closure and Postclosure Plans . . . . . . . . . . . . . . . . . . . . . . . 26 <br /> Groundwater Monitoring System . . . . . . . . . . . . . . . . . . . . . . . 26 <br /> Closure Cost Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 <br /> IV. FINANCIAL ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.