My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:41:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Foothill Sanitary Landfill Preliminary Closure Plan <br /> Revision #1 May 6, 1994 <br /> III . PRELIMINARY CLOSURE COST ESTIMATES <br /> Closure costs are calculated for the closure situation when <br /> closure costs will be the most expensive. The maximum extent of <br /> the landfill that will ever require closure at any given time is <br /> estimated to be when the existing 80 acres needs final cover, the <br /> first 20 acre module has already been lined and partially filled, <br /> and the next module has been partially excavated for soil. The <br /> existing landfill does not have a liner, so the cost estimates <br /> for closure are divided into two sections. The existing 80 acre <br /> closure cost is based on the prescriptive standard of a two. foot <br /> foundation layer, one foot clay barrier layer (1 x 10-5) , and one <br /> foot vegetative layer. The closure for the 20 acre lined module <br /> will be based on the subtitle 0 requirement that the final cover <br /> must meet or exceed the performance of the bottom liner <br /> installed. Such a liner will consist of a two foot foundation <br /> layer, a two foot clay barrier layer with a permeability of 1 x <br /> 10''' cm/sec or less, a layer of geosynthetic liner material, and a <br /> one foot vegetative layer. <br /> Other items of closure cost such as fencing, revegetation, etc. <br /> are also included as closure costs. <br /> FINAL COVER <br /> EXISTING 80 ACRES <br /> Final cover will consist of 2 feet of foundation layer cover <br /> (sandy to silty material) , a 1 foot low-permeability barrier <br /> layer (silty material mixed with imported clay) , and a 1 foot <br /> vegetative layer (sandy to silty material) . One foot of the <br /> foundation layer will have already been placed prior to closure. <br /> 'Therefore, only one foot of additional soil will be needed to <br /> complete the foundation layer for the existing 80 acres. <br /> SOIL REQUIREMENTS <br /> 80 ACRE EXISTING <br /> Foundation layer = 129 , 067 c.y. <br /> Clay cover = 129 , 066 c.y. <br /> Vegetative cover = 129 . 066 c.v. <br /> Totals 387 , 199 c.y. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.