Foothill Sanitary Landfill Preliminary Closure Plan <br /> Revision #1 May 6, 1994 <br /> COST - 20 ACRE EXISTING AREA <br /> Landfill• <br /> a. Seed @ 40 pounds per acre <br /> ($12 . 50/lb X 40 X 20) _ $ 10, 000 <br /> b. 16-20-0 fertilizer @ $200 per acre <br /> ($ . 50/lb X 400 X 20) _ $ 4, 000 <br /> C. Mulch @ $300/acre = <br /> ($ . 20/lb x 1500 X 20) = S 61000 <br /> Total Revegetation $ 20, 000 <br /> LANDFILL GAS MONITORING SYSTEM <br /> A landfill gas monitoring system will be installed at the <br /> Foothill Sanitary Landfill. It will consist of approximately 23 <br /> perimeter monitoring wells with 3 gas monitoring probes in each <br /> well. The perimeter wells will be spaced no more than 1000 feet <br /> apart and they will be drilled to the lowest elevation of refuse <br /> within 1000 feet from the monitoring point. The probes will be <br /> installed as each module is developed. <br /> Should closure occur at the most expensive time in the landfill <br /> life, it is estimated that a maximum of 15 perimeter monitoring <br /> wells would provide sufficient coverage for the modified landfill <br /> closure (10 wells to cover the 80 acre existing area and 5 wells <br /> , for the 20 acre module) <br /> 5 . COST - 80 ACRE EXISTING AREA <br /> A three probe gas well is estimated at $3 , 000 each <br /> (10 X $3 , 000) _ $30, 000 <br /> COST - 20 ACRE LINED MODULE <br /> (5 x $3 , 000) $15, 000 <br /> 23 <br />