Laserfiche WebLink
Foothill Sanitary Landfill Preliminary Closure Plan <br /> Revision sl May 6, 1994 <br /> ADDING OR REMOVING SECURITY SYSTEMS <br /> Steel fence post and wire fence will be placed around the entire <br /> site as it is developed. Therefore, only maintenance and <br /> installation of some locks or gates will be necessary. <br /> 3 . COST $ 1, 500 <br /> STRUCTURE REMOVAL <br /> Those structures that would have to be removed include the <br /> gatehouse (w/concrete scale pit) , foreman's residence, and <br /> maintenance building. Since the demolished structures can be <br /> disposed of on-site, the aggregate 4 , 600 SF of building areas <br /> could be removed for about $2 . 30 SF. <br /> 9 . COST <br /> (4, 600 X $2 .30) _ $ 10,580 <br /> DISMANTLING ENVIRONMENTAL CONTROLS <br /> At the most expensive time of closure demonstrated in this <br /> Closure Plan, no environmental controls will need to be <br /> decommissioned. Therefore, no cost will be incurred for this <br /> section. <br /> CLOSURE AND POSTCLOSURE PLANS <br /> Closure Plan = about $50, 000 and Postclosure Maintenance Plan = <br /> about $10, 000 <br /> 11. COST <br /> ($50, 000 + $10 , 000) _ $ 60, 000 <br /> 25 <br />