Laserfiche WebLink
Foothill Sanitary Landfill Preliminary Closure Plan <br /> Revision #1 May 6, 1994 <br /> FOOTHILL SANITARY LANDFILL <br /> CLOSURE COST ESTIMATES <br /> FINAL COVER $ 2 , 210, 901 <br /> FILL OPEN MODULE $ 112 , 933 <br /> REVEGETATION $ 100, 000 <br /> LANDFILL GAS MONITORING SYSTEM $ 45 , 000 <br /> LEACHATE CONTROL MEASURES $ 10 , 000 <br /> DRAINAGE SYSTEM INSTALLATION $ 4, 500 <br /> ADDING OR REMOVING SECURITY SYSTEMS $ 1, 500 <br /> STRUCTURE REMOVAL $ 10, 580 <br /> DISMANTLING ENVIRONMENTAL CONTROLS $ 0 <br /> CLOSURE AND POSTCLOSURE PLANS $ 60, 000 <br /> GROUNDWATER MONITORING SYSTEM S 30 , 000 <br /> TOTAL $ 2 , 585, 414 <br /> t 20% CONTINGENCY $ 514 , 586 <br /> TOTAL $ 3, 100, 000 <br /> It is estimated that the entire landfilled area could be closed <br /> for approximately $30, 000, 000. However, since the landfill will <br /> -be closed in modules, the total amount needed will be spread out <br /> over the life of the landfill. <br /> 27 <br />