My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 6:26:40 PM
Creation date
7/3/2020 10:41:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 WINTER OPERATIONS <br /> The CDPW will develop winter plans for approval by the LEA. After <br /> approval by the LEA, the County will direct the Operator to <br /> implement the plans. Some elements included in the winter plans <br /> which the Operator will implement are described below. <br /> 10.1 Stockpiling <br /> The winter operations will include use of a stockpile from <br /> excavation which is near the winter work area. The Operator will <br /> perform the excavations for the stockpile, place the soil on the <br /> stockpile, and construct drainage ditches for the stockpile to <br /> permit usage by heavy equipment during rainy conditions. <br /> The stockpile shall be constructed according to CDPW <br /> specifications. <br /> The County will indicate the amount of material to be stockpiled <br /> for the upcoming winter operations by July 31 prior to rainy <br /> season. The Operator shall perform the stockpile activities, as <br /> specified by the County, by October 15 of each year. <br /> 10.2 Drainage <br /> The Operator shall provide for construction of drainage control <br /> features during winter operations as specified in Section 7, <br /> Drainage. <br /> 10.3 Location of Winter operations <br /> The location for winter operations shall be as specified in the <br /> winter plans as approved by the LEA. Should conditions arise which <br /> make this infeasible, the Operator shall obtain approval from the <br /> CDPW prior to using an alternate disposal area. <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.