Laserfiche WebLink
water, and then steam cleaned with deionized water. Any parts that may absorb <br /> contaminants, such as plastic pump valves, bladders, etc., will be cleaned as described <br /> above or replaced. The inside surfaces of the positive displacement(bladder) pump tubing <br /> will be cleaned by heating the tubing overnight at 120°C with a low-flow, inert air source. <br /> Once the bladder pump is cleaned and reassembled, a pump blank will be obtained by <br /> pumping organic-free water through the bladder pump assembly. The pump effluent will <br /> be sampled and analyzed by EPA Method 601. The pump effluent analysis results must <br /> be below the method reporting limit for each parameter before the pump is taken to the <br /> site for use. <br /> During field sampling, equipment surfaces that are placed in the well or contact ground <br /> water will be steam cleaned with deionized water before the next well is purged or <br /> sampled. <br /> Water Level and Total Well Depth Measurements <br /> Immediately before a monitoring well is purged, the water level and total well depth will <br /> be measured using an electric sounder as described in the previous section "Groundwater <br /> Elevation Survey." The electric sounder will be decontaminated by being rinsed with <br /> deionized water after each use. <br /> Well Purging <br /> Before sampling occurs, standing water in the casing and gravel pack will be purged from <br /> the monitoring well using a dedicated Well Wizard' bladder pump, pneumatic <br /> displacement pump, or Teflon`s bailer. Monitoring wells will be purged according to the <br /> protocol presented in Figure A-1. In most monitoring wells, the amount of water purged <br /> before sampling will be equal to or greater than four casing volumes. Some monitoring <br /> wells are expected to be evacuated to dryness after the removal of less than four casing <br /> volumes. These low-yield monitoring wells will be allowed to recharge for up to <br /> 24 hours. Samples will be taken as soon as the monitoring wells have recharged to a level <br /> sufficient for sample collection. If insufficient water has recharged after 24 hours, the <br /> monitoring well will be recorded as dry for the sampling event. <br /> Field measurements will be recorded in a waterproof field logbook. Figure A-2 shows an <br /> example of the Water Sample Field Data Sheet on which field data are recorded. Field <br /> data sheets will be reviewed by the sampling coordinator after the sampling event is <br /> completed. <br /> The pH, specific conductance, and temperature meter will be calibrated each day before <br /> beginning field activities. The calibration will be checked once each day to verify meter <br /> performance. Field meter calibrations will be recorded on a Field Data Sheet (see <br /> Figure A-2). <br /> SAC/pjM939\09390040.gel-95 Ifc:3 A-3 Rev.0 February 14, 1995 <br />