Laserfiche WebLink
Open Channel Calculation - "V" Design <br /> Project: FOOTHILL SANITARY LANDFILL <br /> DESCRIPTION: PRELIMINARY CLOSURE DRAINAGE CALCULATIONS <br /> CALCS. ARE BASED ON MANNINGS FORMULA <br /> Notes: CAPACITY OF A "V" DITCH 3/4 ' DEEP, 50' TOP <br /> n VALUE: 0 . 030 <br /> s (SLOPE) : 0. 0250 <br /> s/s (RATIO TO 1) : 33 . 33 <br /> DEPTH: 0.75 Ft. <br /> BOTTOM WIDTH: 0. 00 Ft. <br /> Top Width: 50. 00 Ft. <br /> -------------------------------------------------------------------- <br /> Area: 18.75 Sq. Ft. <br /> Wetted Perimeter: 50. 02 Ft. <br /> Hydraulic Radius: 0. 3748 <br /> R^ (2/3) : 0.5199 <br /> Velocity: 4. 0714 fps <br /> Flow Quantity: 76.3311 cfs <br /> Design for North Ditch, Top of Landfill (Area K) <br />