My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:41:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_2
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Foothill Sanitary Landfill Preliminary Closure Plan �b <br /> Revision #1 May 6, 1994y g <br /> 20 ACRE LINED MODULE <br /> 20 Acre Module Entire Site <br /> Foundation layer = 32, 267 c.y. 2, 132 ,827 <br /> Clay cover = 64,533 c.y. 2, 003 , 759 <br /> Vegetative Cover = 32 , 267 c.y. 1, 066,413 <br /> Totals 129, 067 c.y. 5, 202, 999 <br /> * Unit Costs for Placement <br /> Foundation and Vegetative laver cover. Assuming excavation <br /> and placement at 120 c.y. /hr. , and using labor costs at <br /> $23 .58 plus scraper operation cost of $60. 10, the following <br /> unit cost calculation applies: <br /> Unit cost ($83 . 68/hr) /120 c.y. /hr. _ $0.70/c.y. <br /> Clay cover -- 1 - 2 ft. thick. The excavation and placement <br /> unit cost will be the same as for the Foundation and <br /> Vegetative Layers. However, the clay will require <br /> additional compaction to 95% of maximum density and will <br /> require an additional unit expense as shown below. <br /> Table for additional compaction cost for clay cover <br /> EQUIPMENT EQUIP. ®PER LABOR PRODUCTION COST/C.Y. <br /> $ $ C.Y. /HR $ <br /> Compactor 14 . 68 23 .58 49 0.78 <br /> Water Truck 5.38 23 .58 108 0.27 <br /> Grader 14 .38 23 .58 866 0. 04 <br /> Supervision 30. 00 650 0. 05 <br /> COMPACTION UNIT COST $1.14/C.Y. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.