My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 10:41:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995_2
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_1995_2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Postclosure Maintenance Plan <br /> Foothill Sanitary Landfill - Revision #1 May, 1994 <br /> VADOSE ZONE MONITORING <br /> It is assumed that there will be 5 lysimeter stations to be <br /> monitored. Based on the costs of vadose zone monitoring at another <br /> County landfill, costs will be as follows. No replacement cost is <br /> anticipated. <br /> 5. COST $12,000 <br /> FINAL COVER MAINTENANCE <br /> Costs will include materials, labor, and repair of final cover due <br /> to erosion, settling, or subsidence. It can be assumed that the <br /> cost for one equipment crew at $700 per day could do the necessary <br /> work in 2 weeks annually. Excess soils necessary for maintaining <br /> final grades will be generated during normal operations. They <br /> will be strategically stockpiled for use. The acquisition of soils <br /> will not be a cost factor for maintenance of final cover grades. <br /> 6. COST <br /> ($700 X 10) _ $7,000 <br /> MAINTAIN DRAINAGE SYSTEM <br /> Assuming 2 operators and two pieces of equipment for 12 days a year <br /> to keep ditches clear and some shaping at $700/day, the annual <br /> ,cost can be computed. <br /> 7 . COST <br /> ($700 X 12) _ $8,400 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.