My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />_ eb Numh. * "11 Ina <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager , V eV V <br />County of San Joaquin <br />Daily Field Report Sequence Number. Days left in contract <br />75 <br />5 <br />Foothill Landfill <br />Location of Work: <br />Stockton Ca. <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Mike Carroll <br />10-02-03 Thursday <br />General Contractor. <br />Wood Brothers <br />Liner Contractor. <br />D&E <br />Project Engineer: Reviewed By: <br />Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other <br />Ryan Wood/ Mark <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt I <br />Clear 890 <br />Frank Dell -Era / Nathan DeWitt <br />Eauinment Utili7M' <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat dozer, Ingersol Rand Smooth Drum roller, TH83 Cat Forklift, 227 Cat Track forklift <br />MOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew D&E: 10 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 17 transfer and end <br />dump trucks. Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the <br />D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of <br />operations soil on to the northern portion of Module 1. Wood Bros. placed the 12" secondary riser pipe <br />utilizing the backhoe and laborers. Wood Bros continued to maintain moisture in the subgrade utilizing the <br />water truck. <br />Tri State poured 14 yards of concrete from American Transit mix Inc, to construct the walls for the <br />containment pad and sump. 4 cylinders were sampled from the 1St load for conformance testing <br />D&E continued installation of Bentofix NWL 35 GCL, 60mil double textured liner geocomposite and <br />geotextile filter fabric. D&E deployed geocomposite in the sump area, geotextile filter fabric on the northern <br />floor, GCL and liner on the southern slope of Module 1. D&E installed a total of 26 panels of GCL totaling <br />approximately 19,17062 and 19 panels of geomembrane totaling approximately 20,702ft2 all anels were <br />overlapped and seamed per specifications. D&E deployed a total of approximately 144,0006 of filter <br />geotextile. The textile was sewn seamed with 6" overlap. D&E placed a total of 17,40062 of geocomposite in <br />the sump and up the eastern slope. All panels were tied a 4' intervals and sewn together. D&E performed <br />repairs and air tests to the liner. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting @ North County. CQA observed <br />placement and pulled a sample of the LCRS drainage aggregate imported today. CQA ran a sieve analysis on <br />the drainage aggregate with .56% passing the #200. CQA observed and logged subgrade acceptance, panel <br />deployment, start-up, seaming, air tests and repairs performed on the liner materials. CQA marked <br />destructive samples for conformance testing. <br />Vector discussed with Wood Bros. next concrete pour will be next Wednesday. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.