Laserfiche WebLink
C <br />Vector Engineering <br />Daily Field Report <br />.Inh Number n IMI nn <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager: <br />County of San Joaquin <br />Daily Field Report Sequence Number. Days left in contract <br />89 <br />-9 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />y of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-22-03 <br />Rednesday <br />General Contractor. <br />Wood Brothers <br />Liner Contractor. <br />D&E Construction <br />Project Engineer: <br />Bryan Fritzler <br />Reviewed By: <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 860 <br />Frank Dell -Era /Nathan DeWitt <br />Fl1111TTYfPTt i stili—A. <br />2 -Water Trucks, 2-D6LGP Cat Dozers, D5CXL Cat dozer, 3-623 Cat Paddle wheel scrapers. I <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew <br />Wood Bros. started the import of drainage aggregate material from Granites Tracy plant. utilizing 24 transfer <br />and end dump trucks. Wood bros graded the drainage aggregate utilizing the D6LGP with a laser set-up and <br />a laborer watching for wrinkles. Wood Bros continued placement of operations material on the floor of <br />Module 1 utilizing 3- 623 paddle wheel scrapers and a D6LGP with a laborer to spread the material. Wood <br />Bros welded the 4" and 6" header pipe crosses. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile A. CQA pulled a sample of drainage aggregate and operations <br />material for conformance testing. CQA performed 4 sieve analyses on the operations material and 1 #200 <br />wash. <br />Vector discussed with Wood Bros. continue drainage aggregate today andoaperations placement. CQA would like more moisture conditioning in <br />the stockpile area. Wood Bros. down to 2 scrapers at 0900 and 1 at 1300.2° scraper running at 1700. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />