Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />92 -12 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-27-03 <br />Monday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt 1 <br />Clear 900 <br />Frank Dell -Era / Nathan DeWitt <br />4--F .1-1 ll t..l . <br />2 -Water Trucks, 3-D6LGP Cat Dozers, 3-623 Cat Paddle wheel scrapers, John Deere Backhoe. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew <br />Wood Bros. continued to grade the drainage aggregate utilizing the D6LGP with a laser set-up and a laborer <br />watching for wrinkles. Wood Bros continued placement of operations material from stockpile 2 on the floor <br />of Module 1 utilizing 3- 623 paddle wheel scrapers and D6LGP/D6H dozers with laborers to spread the <br />material. Wood Bros. continued to weld the 6" header pipe and crosses to the 4" solid pipe up the eastern <br />slope. Wood Bros moisture conditioned material to be placed in the anchor trench on the northern slope. <br />Wood Bros had laborers hand shoveling the gravel from the access ramp on the western slope. <br />Vector Engineering, Inc. CQA observed grading of the LCRS drainage aggregate. CQA observed hauling <br />and grading of the operations layer material from stockpile 2. CQA observed welding of the solid 4" pipe to <br />the 6" header pipe. 0 <br />Vector discussed with Wood Bros D&E will be on site tomorrow morning as will the surveyors. <br />File Name: Foothill Landfill repared By: Frank Dell -Era Reviewed - . A <br />B <br />