Laserfiche WebLink
li..l La k"Vwl1 oe WUrK cumpieteu uurmg the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew <br />Wood Bros. continued to haul and place operations material from stockpile 2 utilizing 3- 623 scrapers and <br />2- D6 dozers with 2- laborers. Wood bros. placed plywood along the anchor trench. Wood Bros. utilized 9 <br />rock trucks to import 1.5"X3/4" sump gravel from Granites Tracy plant. A total of 628.06 tons was imported. <br />D&E completed installation of the geocomposite and the geotextile materials in Module 1. D&E deployed a <br />total of approximately 50,000ft2 of geocomposite. D&E deployed approximately 1,000ft2 of geotextile. All <br />seams were overlapped and sewn per specifications. <br />!Vector Engineering, Inc. CQA observed spreading and grading of operations layer material. CQA observed <br />overlap tying and sewn seams of the geocomposite and geotextile materials deployed today. CQA observed <br />placement and pulled samples of the sump gravel imported from Granites Tracy plant for testing. <br />Vector discussed with Wood Bros Mark said the material hauled in from Granite for the sump rock is the used at North County. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />