My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Foothill Sanitary Landfill — Module 1 December 2003 <br />County of San Joaquin Job No. 031602.00.02 <br />6.0 POLYETHYLENE PIPE AND FITTING <br />6.1 Receiving Inspection <br />Upon arrival by truck shipment, Vector's CQA Monitor performed receiving inspection <br />that included, but was not limited to: 1) verify that the pipe was the proper size and <br />dimensions and that the perforations were the proper size 2) visually inspect that no <br />damage occurred to the pipe during transportation and handling, 3) verify and <br />document that storage of the pipe was in accordance with the Technical Specifications, <br />and 4) ensure that all documentation required by the specifications was received. Data <br />regarding the HDPE pipe is included in Appendix N. <br />6.2 Installation <br />Vector's CQA Monitor observed that the pipe was installed at the locations specified in <br />the construction drawings, and no damage occurred during the placement and backfill <br />around and over the pipe. Vector's CQA Monitor spot -monitored the butt fusion welding <br />operations to ensure that the welding followed the Technical Specifications. <br />As discussed in Section 4.5, the perforations in the pipe were reduced from the <br />specified size of 0.2 -inches to 0.18 -inches to allow for the change in the drainage gravel <br />specifications. <br />Vector Engineering, Inc. • 143E Spring Hill Drive - Grass Valley, CA 95945 • (530) 272-2448 <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.