Laserfiche WebLink
THOMAS R. FLINN <br />DIRECTOR <br />MANUEL SOLORIO <br />DEPUTY DIRECTOR <br />STEVEN WINKLER <br />DEPUTY DIRECTOR <br />BENTON ANGOVE <br />BUSINESS ADMINISTRATOR <br />January 12, 2004 <br />Ms. Kim Schwab <br />California Regional Water Quality Control Board <br />11020 Sun Center Drive, #200 <br />Rancho Cordova, California 95820-6114 <br />SUBJECT: CERTIFICATION REPORT FOR MODULE 1 <br />FOOTHILL SANITARY LANDFILL <br />,rMDear Ms. Schwab: <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201-3018 <br />(209) 468-3000 FAX (209) 468-2999 <br />www.co.san-joaquin.ca.us <br />Enclosed is the Certification Report for the installation of Module 1 at the Foothill Landfill, <br />prepared by Vector Engineering. This report shows that this Module was installed in accordance <br />with the approved design, and that this installation was documented according to the <br />Construction Quality Assurance Plan. <br />As you know, the leachate pumping equipment at Foothill has been installed but not made <br />operational as yet; however, we will notify you as soon as soon as the equipment is ready for <br />your inspection. In the meantime, I hope you can review this document, and verify that it is <br />complete. As you know, we are in urgent need of the new Module. <br />If you have any questions, please call me at (209) 468-3066. <br />Sincerely, <br />i�is�L"sU2(� <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:kf <br />N:\TwoModules�RN�'QCB\KScbwab22-FHCett.doc <br />Enclosure <br />c: Robert McClellon, Environmental Health Department <br />LA 10640D <br />Pp U l Iy <br />r.' `z <br />C4CIFp'Ra\P <br />THOMAS M. GAU <br />DEPUTY DIRECTOR <br />THOMAS R. FLINN <br />DIRECTOR <br />MANUEL SOLORIO <br />DEPUTY DIRECTOR <br />STEVEN WINKLER <br />DEPUTY DIRECTOR <br />BENTON ANGOVE <br />BUSINESS ADMINISTRATOR <br />January 12, 2004 <br />Ms. Kim Schwab <br />California Regional Water Quality Control Board <br />11020 Sun Center Drive, #200 <br />Rancho Cordova, California 95820-6114 <br />SUBJECT: CERTIFICATION REPORT FOR MODULE 1 <br />FOOTHILL SANITARY LANDFILL <br />,rMDear Ms. Schwab: <br />P. O. BOX 1810 - 1810 E. HAZELTON AVENUE <br />STOCKTON, CALIFORNIA 95201-3018 <br />(209) 468-3000 FAX (209) 468-2999 <br />www.co.san-joaquin.ca.us <br />Enclosed is the Certification Report for the installation of Module 1 at the Foothill Landfill, <br />prepared by Vector Engineering. This report shows that this Module was installed in accordance <br />with the approved design, and that this installation was documented according to the <br />Construction Quality Assurance Plan. <br />As you know, the leachate pumping equipment at Foothill has been installed but not made <br />operational as yet; however, we will notify you as soon as soon as the equipment is ready for <br />your inspection. In the meantime, I hope you can review this document, and verify that it is <br />complete. As you know, we are in urgent need of the new Module. <br />If you have any questions, please call me at (209) 468-3066. <br />Sincerely, <br />i�is�L"sU2(� <br />W. MICHAEL CARROLL, PE <br />Senior Civil Engineer <br />WMC:kf <br />N:\TwoModules�RN�'QCB\KScbwab22-FHCett.doc <br />Enclosure <br />c: Robert McClellon, Environmental Health Department <br />LA 10640D <br />