My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering Inc. LARGE SCALE DIRECT SHEAR REPORT <br /> 143E Spring Hill Drive,Grass valley,CA 95945 (530)272-2448 Test Method D-5321 A <br /> LABORATORY SERVICES <br /> Client Name: Report Date: October 28,2003 <br /> ALLIED WASTE, INC. Projec7Name: FORWARD LF Project No: <br /> Superstrate: �� 021605.00 <br /> Material l: �C= Geocomposite,net towards HDPE LSN., 1003D Clam <br /> b ped <br /> Materia/2: <br /> GSE 60 mil HDPE smooth/tex,smooth towards Net csN: 1003B Clamped <br /> Substrate: Bentofix NWL,Burnished side towards raspboard LSN: 1003A Rasp Board <br /> DISPLACEMENT 3000 <br /> vs.SHEAR STRESS <br /> Test Normal <br /> Point Stress i <br /> si psf i PRELIMINARY <br /> 1. 13.9 2000 <br /> 2. 27.8 4000 <br /> 3. 55.6 8000 az000 <br /> 4. 83.3 12000 U) <br /> U)UJ <br /> i <br /> U)1000 <br /> 0 I <br /> 0.0 0.5 1.0 1.5 2.0 2.5 3.0 <br /> HORIZONTAL DISPLACEMENT(inches) <br /> STANDARD CONDITIONS: SHEAR DISPLACEMENT RATE: 0.04 in/min <br /> 1. The"gap"between shear boxes was set at 80 mil(2.0 mm) <br /> 2. The test specimens were flooded during testing unless otherwise noted. <br /> 3. High Normal Stresses,>5psi(35 kPa)was applied using air pressure. <br /> 4. Low Normal Stresses, <5psi(35 kPa)was applied using dead weights. <br /> 5. The tests were terminated after 3.0"(75 mm)of displacement unless otherwise noted. <br /> 6. Tests were performed in general accordance with ASTM procedure D-5321 using a Brainard-Killman LG-112 direct shear machine <br /> with an effective area of 12"x 12"(300 x300 mm). <br /> TEST ORIENTATION: NORMAL STRESS GEOCOMPOSITE <br /> TOP BOX WITH BOARD SPACERS GEOMEMBRANE <br /> GCL <br /> BOTTOM BOX W/RIGID SUBSTRATEAsperity Height: 0.024 In. <br /> 74. The <br /> NOTES: <br /> ecimen of GCL,(burnish down)was cut and stapled to a rasp board in the lower shear box. <br /> E,textured side on the GCL,smooth side up towards geocomposite,is free floating. <br /> posite sample were ciample to the upper box,net towards the smooth HDPE. <br /> /HDPE/Geocomposite were hydrated for 20 hrs.under a 125 psf normal stress then loaded to the Normal stress for 24 hrs <br /> 5. Shearing occurred at the interface of the geocomposite and geomembrane smooth surface. <br /> 6. The Friction Angle and Adhesion(or Cohesion)results given here are based on a mathematically determined best fit line. <br /> 7. Further interpretation should be conducted by a qualified professional experienced in geosynthetic and geotechnical engineering. <br /> results apply only to the above listed samples/materials. The data and information are proprietary and cannot be released without authorization or Vector Engineering inc. <br /> :da7, tph <br /> ng the data and result represented on this page.Client agrees to limit the liability of Vector Engineering,tnc.from client and all other parties for claims arising out o1useofthis cost for the respective test(s)represented hereon,and Client agrees to indemnity and hold harmless Vector from and against all ffabifity in excess of the aforementioned limit. <br /> L:1 fabexcel I Projects 1 1902 1 021605 1 1003A-lsds Entered By: KRC Print Date: 10/28,103 Rev By Lab Log: <br /> DCN:LSDS-rp(rev 0, 03/24103) ! <br /> Page 2 of 2 1003A <br />
The URL can be used to link to this page
Your browser does not support the video tag.