My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> MOBILIZATION AND DEMOBILIZATION <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: Mobilization and demobilization. <br /> 1.2 DESCRIPTION <br /> A. Mobilization shall include: <br /> 1. Mobilization of all construction equipment, materials, supplies, <br /> appurtenances, and the like, manned and ready for commencing and <br /> performing the work. <br /> 2. Assembly and delivery to the site of equipment, materials, and supplies <br /> necessary for the performance of the work but which are not intended to be <br /> incorporated in the work; preparation of the CONTRACTOR's work area; <br /> complete assembly, and in working order, of equipment necessary to <br /> perform the required work; personnel services preparatory to commencing <br /> actual work; and all other preparatory work required to permit <br /> commencement of the actual work on construction items for which payment <br /> is provided under the Contract. <br /> B. Demobilization shall include: <br /> 1. Removal from the site of all construction plant, equipment, materials, <br /> supplies, appurtenances, and the like upon completion of the work. <br /> 2. Cleaning and restoration of the site. <br /> PART 2 PRODUCTS (Not Used) <br /> PART 3 EXECUTION (Not Used) <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200,PRICE AND <br /> PAYMENT PROCEDURES) <br /> END OF SECTION <br /> Forward Landfill WMU FU-04 MOBILIZATION AND <br /> 01710 1 DEMOBILIZATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.