4. Delays caused by inadequate stockpiling operation, as determined by the <br /> QA/QC CONSULTANT, shall not be cause for an extension in the <br /> EARTHWORK CONTRACTOR's completion dates or cause for <br /> EARTHWORK CONTRACTOR change orders and all additional cost <br /> associated shall be at the EARTHWORK CONTRACTOR's sole expense. <br /> 3.7 SUBGRADE FILL <br /> A. Place Subgrade Fill at locations shown on the Construction Drawings or as <br /> directed by the QA/QC Consultant. Place material in lifts not exceeding 8-inch <br /> uniform thickness. Each lift shall be compacted to a relative compaction of not <br /> less than 90 percent (ASTM D1557). <br /> B. During all compacting operations, maintain optimum practicable moisture content <br /> required for compaction purposes in each lift of fill. Maintain uniform moisture <br /> content throughout the lift. At the time of compaction, the water content of the <br /> material shall be within 4 percent of the optimum moisture content. <br /> C. Do not attempt to compact fill material that contains excessive moisture. Aerate <br /> material by blading, discing, harrowing, or other methods to hasten the drying <br /> process. <br /> 3.8 GRADING AND SUBGRADE PREPARATION <br /> A. This Work shall consist of fine grading and preparation of lining subgrade for the <br /> construction of the base and side slope lining. The lining subgrade is further <br /> defined as those areas and surfaces within the subgrade upon which lining <br /> materials are to be placed. <br /> 1. Fine grading shall be performed to grade the subgrade to within the tolerances <br /> specified in Section 01410, SURVEYS. <br /> 2. The prepared subgrade surface shall be smooth and free of major irregularities. <br /> The subgrade should contain no exposed particles larger than 3 inches or other <br /> surface irregularities which, in the opinion of the QA/QC CONSULTANT, <br /> will damage the overlying GCL, 60-mil HDPE geomembrane, or Geogrid. <br /> 3. Overexcavation below the established lining subgrade by the EARTHWORK <br /> CONTRACTOR shall, at his expense, be backfilled with Clay Liner Material <br /> or General Earthfill Material as directed by the QA/QC CONSULTANT. <br /> 4. Once completed, all traffic shall be kept off the lining subgrade. <br /> 5. The lining subgrade shall be maintained in the finished condition until the first <br /> succeeding course is placed. Any damage to the prepared lining subgrade by <br /> the EARTHWORK CONTRACTOR shall be repaired, at the EARTHWORK <br /> CONTRACTOR's expense. Any damage to the prepared lining subgrade by <br /> the GEOSYNTHETICS CONTRACTOR, including those caused by a delay <br /> of the GEOSYNHETICS CONTRACTOR, shall be at the <br /> GEOSYNTHETICS CONTRACTOR's expense. 0 <br /> Forward Landfill WMU FU-04 <br /> 02300 12 EARTHWORK <br />