My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. If Clay Plug Material is too dry, add water to material by sprinkling, then <br /> mixing or discing to make moisture content uniform throughout lift. <br /> 3. Do not attempt to compact Clay Plug Material that contains excessive <br /> moisture. Aerate material by blading, discing, harrowing, or other methods, <br /> to hasten drying process. <br /> D. Field Quality Control <br /> 1. As the clay plug material is being placed and compacted, the QA/QC <br /> CONSULTANT will be monitoring the construction activities and soil <br /> properties as described in the CQA Manual. Acceptance testing frequencies <br /> are defined in the CQA Manual. The EARTHWORK CONTRACTOR <br /> shall cooperate with the QA/QC CONSULTANT in obtaining samples for <br /> the CQA acceptance testing, and in leveling and backfilling areas designated <br /> by the QA/QC CONSULTANT. <br /> 2. Holes left by sampling and testing shall be backfilled by the EARTHWORK <br /> CONTRACTOR using the Clay Liner Material. <br /> 3. If acceptance testing by the QA/QC CONSULTANT indicates that the Clay <br /> Plug Material does not meet specified requirements for density, water <br /> content, or lift thickness, the EARTHWORK CONTRACTOR shall <br /> terminate material placement until corrective measures are taken at the <br /> EARTHWORK CONTRACTOR's sole expense. Corrective measures <br /> could include, but are not limited to, scarifying and recompacting of <br /> material or removal of material that does not meet the requirements of these <br /> Specifications. <br /> E. Protection: <br /> 1. The clay plug shall be protected from any contamination which increases <br /> the hydraulic conductivity. Any contaminated material shall be removed <br /> and replaced at no cost to the OWNER. <br /> 3.11 COARSE GRAVEL MATERIAL <br /> A. General Requirements: Coarse Gravel shall be placed around leachate collection <br /> pipe and in sump area as shown on the Construction Drawings and should be fully <br /> encapsulated by geotextile. <br /> B. Coarse Gravel Placement: <br /> 1. The HDPE geomembrane lining underlying the Coarse Gravel shall be <br /> inspected and approved prior to placement of the Coarse Gravel. <br /> Is <br /> Forward Landfill WMU FU-04 <br /> 02300 18 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.