B. The OWNER will conduct detailed topographic surveys of site to document "as- <br /> built" prepared subgrade on base and slope, thickness and grade of clay liner <br /> installed, thickness of granular drainage layer installed, thickness of protective <br /> operations layer installed, dimensions of termination berms and sumps, <br /> terminations of geomembrane liner, and location of the interior crest of anchor <br /> trenches. All surveys will be performed in accordance with Section 01410, <br /> SURVEYS. <br /> 1. Measure area elevations on minimum 75-foot-grid over entire area and at all <br /> breaks in grade. <br /> 2. Establish reference grid at minimum 75-foot centers for surveying materials <br /> with a thickness requirement. <br /> 3. Measure linear dimensions a minimum of 75-feet on center. <br /> 4. Plot results of topographic surveys to scale of 1 inch equals 50 feet and <br /> provide survey information in electronic format to QA/QC CONSULTANT. <br /> 5. QA/QC CONSULTANT will check the survey. The EARTHWORK <br /> CONTRACTOR shall not construct next layer of the lining system until <br /> survey approval is provided by the QA/QCCONSULTANT. QA/QC <br /> CONSULTANT`s review shall be completed within 2 working days <br /> following receipt of the as-built survey information. <br /> 3.28 ACCEPTANCE OF WORK <br /> A. Final acceptance will be based on tests made on completed Work, on samples of <br /> material taken from the completed layers, and the as-built surveys. Testing for <br /> final acceptance will be performed by the QA/QC CONSULTANT in accordance <br /> with the requirements of these Specifications and the CQA Manual. <br /> 3.29 REMOVAL OF WATER <br /> A. Provide and operate equipment adequate to keep all excavations and trenches free <br /> of water. Remove all water as required for efficient and safe execution of the <br /> work, and as required by the QA/QC CONSULTANT. Avoid settlement or <br /> damage to adjacent property. Dispose of water in a manner that will not damage <br /> adjacent property. When dewatering open excavations, dewater from outside the <br /> structural limits and from a point below the bottom of the excavation when <br /> possible. Design dewatering system to prevent removal of fines from existing <br /> ground. <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, PRICE AND <br /> PAYMENT PROCEDURES) <br /> END OF SECTION <br /> Forward Landfill WMU FU-04 <br /> 02300 28 EARTHWORK <br />