My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Care shall be taken to remove any soil or other material that may have penetrated the <br /> torn geosynthetic clay liner. <br /> C. All repairs shall be made at no additional cost to the OWNER. <br /> D. The patch shall not be nailed or stapled. <br /> 3.9 PRODUCT PROTECTION <br /> A. The GEOSYNTHETICS CONTRACTOR O RACTOR shall use all means necessary to protect <br /> all prior work and materials and completed work of other Sections. <br /> B. In the event of damage,the GEOSYNTHETICS CONTRACTOR shall immediately <br /> make all repairs and replacements necessary, to the approval of the QA/QC <br /> CONSULTANT and at no additional cost to the OWNER. <br /> 3.10 ACCEPTANCE <br /> A. GEOSYNTHETICS CONTRACTOR shall retain ownership and responsibility <br /> for GCL until accepted by OWNER. <br /> B. OWNER will accept GCL when all of the following conditions are met: <br /> 1. The installation is complete. <br /> 2. Required documentation is complete. <br /> 3. The QA/QC CONSULTANT's final report is complete. <br /> 4. Verification of the adequacy of all seams and repairs, including associated <br /> testing, is completed. <br /> 5. Written certification documents have been received by the QA/QC <br /> CONSULTANT and OWNER. <br /> PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, PRICE AND <br /> PAYMENT PROCEDURES) <br /> END OF SECTION <br /> Forward Landfill WMU FU-04 10 GEOSYNTHETIC CLAY LINER(GCL) <br /> 02777 <br />
The URL can be used to link to this page
Your browser does not support the video tag.