My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Overlap connections may be used if the GEOSYNTHETICS CONTRACTOR <br /> provides the DESIGN ENGINEER independent test documentation which <br /> demonstrates that the load/deformation characteristics of the overlap of geogrid <br /> materials is equal to or exceeds those of the geogrid. The minimum overlap shall be 3 <br /> feet. <br /> 3.4 FILL PLACEMENT OVER GEOGRID <br /> A. Backfill material shall be placed in lifts and compacted as directed under Section <br /> 02300. Backfill shall be placed, spread, and compacted in such a manner that <br /> minimizes the development of wrinkles in and/or movement of the geogrid. <br /> B. Tracked construction equipment shall not be operated directly on the geogrid. A <br /> minimum fill thickness of 6 inches is required prior to operation of tracked vehicles <br /> over the geogrid. Turning of tracked vehicles should be kept to a minimum to prevent <br /> tracks from displacing the fill and damaging the geogrid. <br /> 3.7 REPAIR <br /> A. Any geogrid damaged during installation shall be replaced by the either the <br /> EARTHWORK CONTRACTOR or GEOSYNTHETICS CONTRACTOR, <br /> depending on the party that caused the damage, at no additional cost to the Owner. <br /> B. Coated geogrids shall not be used if the coating is torn, shedding, cracked, punctured, <br /> flawed or cut, unless a repair procedure is carried out as approved by the Design <br /> Engineer. The repair procedure shall include placing a suitable patch over the <br /> defective area or applying a coating solution identical to the original coating. <br /> 3.8 PROTECTION <br /> A. Follow the Manufacturer's recommendations regarding protection from exposure to <br /> sunlight. <br /> END OF SECTION <br /> Forward Landfill WMU FU-04 <br /> 02779 7 GEOGRID <br />
The URL can be used to link to this page
Your browser does not support the video tag.