My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:42:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Verify that pipe ends are squarely faced with the facing tool of the fusion welding <br /> machine. <br /> • Verify that pipe ends line up in the fusion welding machine and that the pipe ends meet <br /> squarely and completely over the entire surface to be welded. Verify at this point that the <br /> pipe is securely clamped into place so that the pipe does not move during the fusion <br /> welding process. <br /> • Verify that the heater plate is clean and maintains the appropriate temperature. Verify <br /> that the heater plate is inserted between the aligned pipe ends and that the pipe ends are <br /> firmly brought into contact with the heater plate. NO PRESSURE should be applied to <br /> achieve the melt pattern. <br /> • Verify that the pipe ends are allowed to heat and soften. As the pipe heats and softens a <br /> melt bead begins to roll back from the contact point of the heater plate and the pipe ends. <br /> Approximate diameter size of melt beads for various sizes of pipe are as follows: <br /> Pipe Size Diameter of Melt Bead <br /> 2-inch and below 1/16-inch <br /> 3-inch to 5-inch 1/1 8-inch <br /> 5-inch to 12-inch 3/1-6-inch <br /> 12-inch to 22-inch 1/4-inch to 5/16-inch <br /> 24-inch to 54-inch 5/16-inch to 7/16-inch <br /> • Verify that the heater plate is removed quickly and cleanly when the appropriate melt <br /> bead is achieved and that no melted pipe material sticks to the heater plate. If melted <br /> material sticks to the heater plate,verify that this joint is discontinued,the heater plate is <br /> cleaned, the pipe ends are re-faced, and that the joint is re-started. <br /> • Verify that the melted pipe ends are rapidly joined together and that enough pressure is <br /> applied to the joint to form a melt bead 1/8-inch to 3/16-inch in diameter around the <br /> entire circumference of the pipe. Pressure is critical to cause the heated material of each <br /> pipe end to flow together. <br /> • Verify that the joint is allowed to cool and solidify properly before the pipe is released <br /> from the fusion welding machine. Cooling and solidification is completed when your <br /> finger can remain comfortably on the bead. <br /> Page 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.