Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTSORDER NO. R5-2003-0020 -9- <br />FOR COUNTY OF SAN JOAQUIN <br />FOR CONSTRUCTION, OPERATION, CLOSURE AND EVALUATION MONITORING <br />FOOTHILL SANITARY LANDFILL, MUNICIPAL SANITARY LANDFILL <br />SAN JOAQUIN COUNTY <br />engineered alternative is consistent with the performance goals of the prescriptive standard <br />and affords equivalent protection against water quality impairment. <br />55. The leachate collection and removal system collection components consist of (from top to <br />bottom): <br />• 2 -foot thick soil operations layer; <br />• 8-oz/sy nonwoven geotextile separator/filter; <br />• 0.75 -foot -thick gravel drainage layer on base areas, and a geocomposite drain on the side <br />slopes; and <br />• Leachate collection troughs with 4- and 6 -inch -diameter lateral and header piping, <br />surrounded with drainage gravel. <br />56. Each lateral leachate pipe is equipped with a pipe riser at each end for inspection, and <br />cleaning if necessary, during the operational life of the module. A wire rope or cable will also <br />be installed in each leachate lateral pipe to enable pull through of a video camera for LCRS <br />inspection, if necessary. <br />57. All lateral and header leachate pipes are sized for flow capacities at least twice peak design <br />flows from modeled "worst case" peak leachate production. The peak monthly leachate <br />production, based on leachate removal records at the nearby North County Recycling Center <br />and Sanitary Landfill is 200,000 gallons per month. <br />58. A 4 -foot deep leachate removal sump allows for a 3 -foot depth of leachate over a 2 -foot deep <br />monitoring trench, without leachate backup into the LCRS collection troughs. A leachate pipe <br />riser is provided for leachate monitoring and removal. The leachate removal pump system <br />includes leachate level monitoring sensors, pump, automatic pump controls, and a flow <br />system to record leachate volumes removed. An above ground leachate storage tank facility <br />will receive leachate pumped from the sump, in advance of leachate handling for disposal. <br />59. The sump area is underlain with a secondary composite liner system, equipped with a <br />monitoring sump and pump system to provide additional protection against the higher leachate <br />head necessary within the leachate sump area. The system is designed to remove, far in <br />excess of estimated peak flows, to preclude leachate head build-up on the base liner beyond <br />the limits of the sump. A monitoring riser 12 inches in diameter is provided to enable <br />monitoring for leachate, and its removal, if present. <br />60. Construction will proceed only after all applicable construction quality assurance plans have <br />been approved by Executive Officer. <br />