Laserfiche WebLink
d <br />own <br />uv <br />I I <br />r ti /—EXISTING M <br />GROUND <br />J <br />r <br />w <br />z <br />m <br />g <br />>M <br />r <br />w <br />In <br />® <br />DATE <br />0 <br />LLJn <br />D <br />� <br />DATE I APPROVAL RECOMMENDED I DATE <br />OPT <br />7113/09 <br />o <br />� � <br />Z <br />m <br />a <br />g <br />o <br />v <br />z v <br />w <br />m z <br />;Y <br />� <br />o <br />i <br />w <br />i <br />i <br />I <br />!3 <br />• <br />I <br />0 <br />\i <br />m <br />;0 <br />m <br />o <br />0 <br />0 <br />I <br />b <br />BOLLARDS OR COW BARRIERS PER <br />WELL SCHEDULE <br />wry i r�,n nn for / I <br />z z <br />g � <br />N INSCRIBE WELL NUMBER <br />AND DATE IN WET CONCRETE <br />CLASS 2 AB <br />4 FT ALL AROUND <br />CONCRETE <br />NEAT CEMENT <br />3x3x3 DOBIE (EACH SIDE) 4 o <br />2'-0" <br />5'-0" MIN <br />6" <br />6" <br />5'-0" MIN <br />SAMPLING INTERVAL VARIES (TYP) <br />i i1/GRA <br />SCALE: NTS <br />5'-0" MIN <br />• SHALLOW ° <br />PROBE PIPE ®;1 t) <br />PROBE PIPE TIP AT BOTTOM <br />OF ROCK SECTION (TYP) f� <br />f�!7y <br />3/47 PROBE PIPE K 4 " <br />(TYP OF 3) <br />5 6 <br />J JG W f <br />A GRAVEL (TYP) <br />s <br />PERFORATIONS 7 a <br />INTERMEDIATE <br />PROBE PIPE `t <br />i — <br />3 <br />BENTONITE (TYP)®(t <br />✓� vl �4t, <br />DEEP T <br />a PROBE PIPE ` <br />' PROBE PIPE WEIGHT (TYP) <br />f % i <br />I" MIN <br />SECTION <br />UN <br />r <br />J NO SCALE <br />MONITORING WE LS AT TIHE NORTH COUGNTTYTAND <br />>M <br />r <br />1 <br />FOOTHILL SANITARY LANDFILLS <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER DATE CHECKED <br />DATE I APPROVAL RECOMMENDED I DATE <br />J Chandra <br />7113/09 <br />J Chandra 1 7/13/091 J Chandra <br />1 7/131091 1 <br />ar r <br />13 <br />NOTE: <br />1. CONSTRUCTION OF WELL TO THE TOP OF SHALLOW PROBE'S BENTONITE <br />PLUG AS SHOWN SHALL BE DURING EHD INSPECTION. <br />2. SEE DETAIL 1 ON SHEET 7. <br />3. SEE DETAIL 3 ON SHEET 7. REVISION DATE <br />4. DIMENSIONS MAY BE ADJUSTED BY THE ENGINEER TO AVOID 7-13-09 <br />OBSTRUCTION OF HIGH PERMEABILITY LENSES. <br />DES CKY BY <br />FR%llltki - J CMANDRA <br />Sheet No. <br />5 of 7 <br />r <br />>M <br />r <br />1 <br />" <br />� <br />t <br />i <br />i <br />i <br />I <br />i <br />• <br />I <br />i <br />i <br />13 <br />NOTE: <br />1. CONSTRUCTION OF WELL TO THE TOP OF SHALLOW PROBE'S BENTONITE <br />PLUG AS SHOWN SHALL BE DURING EHD INSPECTION. <br />2. SEE DETAIL 1 ON SHEET 7. <br />3. SEE DETAIL 3 ON SHEET 7. REVISION DATE <br />4. DIMENSIONS MAY BE ADJUSTED BY THE ENGINEER TO AVOID 7-13-09 <br />OBSTRUCTION OF HIGH PERMEABILITY LENSES. <br />DES CKY BY <br />FR%llltki - J CMANDRA <br />Sheet No. <br />5 of 7 <br />NOTE: <br />1. CONSTRUCTION OF WELL TO THE TOP OF SHALLOW PROBE'S BENTONITE <br />PLUG AS SHOWN SHALL BE DURING EHD INSPECTION. <br />2. SEE DETAIL 1 ON SHEET 7. <br />3. SEE DETAIL 3 ON SHEET 7. REVISION DATE <br />4. DIMENSIONS MAY BE ADJUSTED BY THE ENGINEER TO AVOID 7-13-09 <br />OBSTRUCTION OF HIGH PERMEABILITY LENSES. <br />DES CKY BY <br />FR%llltki - J CMANDRA <br />Sheet No. <br />5 of 7 <br />