Laserfiche WebLink
m <br /> rel v <br /> BOLLARDS OR COW BARRIERS PER WELL SCHEDULE <br /> WELL ENCLOSURE 1 <br /> WELLSCHEDULE <br /> 5 tl FOOTHILL LANDFILL <br /> EXISTING < INSCRIBE WELL NUMBER DEPTH(FT) <br /> WELL N (NOTE 4) COW <br /> GROUND AND DATE IN WET CONCRETE BOLLARDS <br /> CLASS 2 AB DIM A DIM B BARRIER <br /> 4 FT ALL AROUND <br /> (NOTE 2) (NOTE 3) <br /> D SG-102 94 54 X <br /> 1 CONCRETE <br /> NEAT CEMENT k SG-103 95 55 X <br /> ryy�tC SG-104 92 53 X <br /> 3x3x3 DOBI€(EACH SID <J /, SG-105 101 58 X <br /> 2'-0" 11 <br /> 5'-0" MIN SG-106 ---120 67 r X ._..� <br /> — - <br /> o �^ SG-107 146 _80 X <br /> SG 108 149 82 X <br /> 6" P OPIPE SG-109 166 g0 X <br /> SG-110 l6o 87 X <br /> z m PROBE PIPE TIP AT BOTTOM SG-111 128 71 X <br /> ROCK SECTION (TYP) _ <br /> +u SG-112 106 u 60 -- -X--- —i-- <br /> �, � cs �5 W - -X - <br /> n g 5'-0"MIN 4"PROBE PIPE 4 _SG-113 103 59 - <br /> 1a (i OF 3) 5 6 SG-114 74 4 44 X �- <br /> P t5 — — --- <br /> m o 6" SG 115 66 40" X <br /> o GRAVEL (TYP) ' <br /> z w SG-116 72—_ 43 X <br /> N PERFORATIONS -- <br /> " <br /> z (TYP) \ /,\ SG 117 66 `10-- X <br /> INTERMEDIATE c ,v SG-118 63 39 X <br /> ID IDPROBE PIPE t5• SG-119 64 39 <br /> SAMPLING INTERVAL VARIES (TYP) X <br /> cr d®` SG-120 92 53 X <br /> W I J SG-121 86 50 X <br /> 5'-0" MIN d SG-122 69 42 X vJ r f BENTONITE(TYP) SG-123 !--68 —41 x <br /> \! �� DEEP SG-124 87 51 - X _ <br /> .S PROBE PIPE60`S SG-125 85 50 X <br /> 0 PROBE PIPE WEIGHT(TYP) NC— <br /> Ml <br /> C.m <br /> A t(ub WELL BOTTOM yI�I I. CONSTRUCTION OF WELL TO THE TOP OF SHALLOW PROBE'S BENTONITE <br /> PLUG AS SHOWN SHALL BE DURING EHD INSPECTION. <br /> 8"MIN 2. SEE DETAIL i ON SHEET 7. <br /> Z LFG MIGRATION MONITORING WELL — FOOTHILL LANDFILL 3 SEE DETAIL 3 ON SHEET 7. <br /> REVISION DATE DES CKY BY <br /> ,(l(X\l 4 5 SCALE: NT$ SECTION 4. DIMENSIONS MAY BE ADJUSTED BY THE ENGINEER TO AVOID 1 7-I3-09 CLARIFICAMN j GLUM <br /> OBSTRUCTION OF HIGH PERMEABILITY LENSES. <br /> l <br /> COUNTY 0 F SAN J OAQ UIN NO SCALE MONITORINGjSTCONSTRUCTION <br /> LS AT TIME NORTH MIGRATION <br /> ICR Y ION <br /> P FOOTHILL SANITARY LANDFILLS FOOTHILL LANDFILL WELL AND SCHEDULE FSheet No. <br /> m� v'�5teudl lU� DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE f 7 <br /> ,J V J Chondro 7/i3Po9 J Chandra. 7/t 3/09 . J Chandra 7/13109 <br />