Laserfiche WebLink
provided with an adjustment valve, sampling port, and temperature gauge. <br />gas N FG) system was Prepared for the landfill cite R d inn6 orlon in the Dr ient Desmon Repe, <br />Aprol 5, 2005 (Appendffix 0). These idnnUments present a nrelirninani desecin sUhieot to reii�inne <br />in final ,demi^., The LFG collection rate at each well is adffiusted aasedadiusted based on the <br />methane content at each well: the vacuum is increased or decreased to maintain the methane <br />content within a prescribed range. <br />LFG collected from the wells is conducted to the LFG flare station, where it is burned in an open <br />flare in accordance with the Permit to Operate issued by the AQMD. <br />LFG is not utilized as an energy source at this time: however, the County has a contractor with <br />Ameresco, Inc, for the development of the LFG as a fuel for electrical generation. <br />The noals of the LFG system innL Erle• <br />AAA/ /MCPS\ reci ure that the ices int ecotimate the eFnmssinns for the ioUS <br />iqlaGement ofFefuse *n-!��� full GalendaF year then the County well be recw*Fed tp <br />prepare a plan to nentrol emissienc. The em*ssoons estimate innornoratino refs se rd*spe ped in <br />N��Nu�v crK�rwrrcvyy�myrVrfiT•wryrr.7. <br />2003, submetted On OGtobeF 2004, ind*Gated that the NMQG ---aFe 46.8 M -Q <br />Foothill Sanitary Landfill Page 89 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin — Revised 7/30/10 <br />