Laserfiche WebLink
The -grading plan for Module 1 includes bringing the refuse to near the permitted <br />elevation. <br />Grading plans for other Modules will be prepared as needed to address drainage issues <br />of these Modules and to guide the landfill operator in the placement of refuse These <br />intermediate Plans will coordinate with the final -grading plan (Appendix �.�E) <br />5.4.45.7.2 Excavation_ d'_rStockpiling <br />The design of each module's construction will include an excavation plan and stockpile <br />plan as needed. Excavation plans include the earthwork slopes and base grades, liner <br />limits, LCRS systems, perimeter berms, haul ramps, drainage ditches and storm _water <br />basins, and locations of ancillary facilities. The stockpile plans will show the location and <br />grading contours for temporary placement of the surplus soils excavated from the <br />modules i, f any. <br />It is the County's intent to excavate the next module's base while obtaining cover soil for <br />the active module. This will minimize the soil stockpiled. However, any soil removed in <br />the preparation of a module may be stockpiled where convenient for future use. This will <br />allow close access for retrieval of daily and intermediate cover soil from the stockpiles. <br />NeaF the elssuFe of #1}site of landfill development The County ma�stock ile pad <br />ecGsoil for is use in final cover. Such stockpiles may be placed on the 80 -acre parcel <br />east of the permitted landfill footprint. <br />that have been filled to interim heights or on the eighfiv-atIrIn <br />Nu1yy <br />nnrnolownedoned by the Gnunty. <br />Foothill Sanitary Landfill Page 55 Public Works/Solid Waste <br />Joint Technical Document County of San Joaquin — Revised 7/30/10 <br />