Laserfiche WebLink
CLEANUP AND ABATEMENT ORDER NO. R5-2004-0706 <br />COUNTY OF SAN JOAQUIN AND FOOTHILL SANITARY LANDFILL, INC. <br />.CALAVERAS COUNTY <br />contain a detailed description of the technologically and economically feasible corrective <br />action measures that could be taken to achieve background concentrations for all Constituents <br />of Concern. <br />ENFORCEMENT HISTORY <br />7. On November 6, 2002, the Discharger submitted an Evaluation Monitoring Plan, which <br />describes the criteria for delineating the nature and extent of groundwater pollution. Because <br />Module "f' is unlined and presumed to be a source of waste discharges, the WDRs require the <br />closure of Module "I" as part of the corrective action measures. <br />WDRs Order No. R5-2003-0020, Provision J.12, requires that the Discharger submit on 1 June <br />2003, the Engineering Feasibility Study report, which includes closure of Module "I". The <br />Discharger did not submit the document by the date of compliance. <br />9. On 16 September 2003, the Executive Officer issued a CWC 13267 Order requiring the <br />Discharger to submit two reports, including (a) the Engineering Feasibility Study report, <br />which includes the closure of Module "I", required by the WDRs and (b) a Partial Cover <br />workplan, which includes design and construction of the soil cover for all modules in the Unit <br />and addresses the performance standards for precipitation and drainage controls. The WDRs <br />• required the reports be submitted on 1 June 2003. The CWC 13267 Order required the <br />documents to be submitted on 1 November 2003. <br />10. On 30 October 2003, the Discharger submitted the Partial Cover workplan and the <br />Engineering Feasibility Study Report and Corrective Action Program. These documents did <br />not include a closure plan for Module "I" in compliance with WDRs Order No. R5-2003-0020 <br />or Title 27 CCR. <br />11. On 16 December 2003, the Executive Officer issued an Administrative Civil Liability <br />Complaint (ACLC) No. R5-2003-0159 in the amount of $10,000 for non -submittal of (a) the <br />Engineering Feasibility Study report including the closure of Module "I", as required by the <br />WDRs, and (b) a Partial Cover workplan including specifications for design and construction <br />of the soil cover for all modules in the Unit and specifies the performance standards for <br />precipitation and drainage controls; in compliance with closure standards set forth in WDRs <br />and Title 27 CCR. <br />12. The Executive Officer and Discharger entered into a settlement discussion and agreed to <br />resolve by consent and without further administrative proceedings the alleged violations of the <br />CWC and WDRs. The Discharger agreed to pay $10,000 in proposed civil liability and the <br />Executive Officer agreed to revise the ACLC No. R5-2003-0159 (the new order is ACLC No. <br />R5-2604-0520). The Discharger further agreed to accept CAO R5-2004-0706, which is <br />intended to address releases from Module "I," and the Executive Officer agreed, if landfill gas <br />releases are successfully eliminated, to recommend a modification of WDRs Order No. R5- <br />0 <br />